Live dealer blackjack https://livedealercasino.online/blackjack/

 
Home
Search
 
 
 

Viramgam-Mahesana Railway Project

     

The Viramgam-Mahesana Gauge Conversion Project was the first railway BOT project in India executed by DSC Limited India. It consisted of the gauge conversion of an existing meter gauge line to broad gauge with a total length of 90 kms.

 
 
 
Project Name
Viramgam-Mahesana Railway Project
Project Location Gujarat
Project Type BOT (Annuity)
Project Length 90 kms
Project Owner Western Railway
Concessionaire Viramgam Mahesana Project Ltd.
 
 

Best online casino Australia deals is here https://aucasinosonline.com/blackjack/

  Copyright 2011 - DSC Limited. All rights reserved.