Live dealer blackjack https://livedealercasino.online/blackjack/

 
Home
Search
 
 
 

Raipur-Durg Expressway

     

 

The Raipur-Durg Road is the first BOT expressway project completed by DSC Limited India. This high-speed urban expressway of 26.6 kms links Raipur-Bhilai Steel city & Durg on NH-6 in the state of Chhattisgarh. The expressway has played a pivotal role in increasing the connectivity and accessibility for both local commuters and national goods carriers. With the development of this facility, commuting time between the two cities has also been reduced to just 45 minutes. The expressway also connects Chhattisgarh with Vishakapatnam, one of the most important ports of India and Mumbai, the financial capital of the country.

 

 
 
 
Project Name
Raipur-Durg Expressway
Project Location Chhattisgarh
Project Type BOT
Project Length 26 kms
Project Owner MORTH
Concessionaire DSC Ventures Ltd.
Concession Period 11 yrs 9 months
 
 

Best online casino Australia deals is here https://aucasinosonline.com/blackjack/

  Copyright 2011 - DSC Limited. All rights reserved.